Sourcing, manufacturing and assembly — managed for you
Parts sourced, factories checked, lines set up. Quality checked in China before anything ships.
Typical timeline
6–12 weeks to first shipment
From frozen design to first shipment. Reorders are faster.
Steps
11
In 3 phases, each one written down.
Your approvals
4
Nothing moves past one without you.
Video updates
2
Recorded demos, plus a weekly update.
The lifecycle
11 steps in 3 phases, on one board. Point at any step for its detail.
How every project runsPHASE 014
Source
Every part bought right.
PHASE 023
Prepare the line
Jigs, guides and a golden sample.
PHASE 034
Produce
Volume, checked at every step.
01 BOM · Source
Volume BOM review
Price, stock and lifecycle checked at volume.
- MOQ and price breaks
- Lead times
- Second sources
- Cost-down options
You getProduction BOM
11 steps · 3 phases · point at any step for its detail Your approval Video update
01Source
4 steps01 BOM · Source
Volume BOM review
Price, stock and lifecycle checked at volume.
- MOQ and price breaks
- Lead times
- Second sources
- Cost-down options
You getProduction BOM
02Prepare the line
3 steps03Produce
4 stepsWhat's included
The checks built in, what you take away, and what we need to start.
Full quality processChecks built in
Every one leaves a record.
- Lifecycle check on every part
- Supplier audits
- Incoming part inspection
- Signed golden sample
- Pilot run with yield
- Photo work instructions
- Every unit tested
- Pre-shipment AQL report
You get
Yours in full.
- Production BOM and suppliers
- Landed cost
- Jigs and work instructions
- Golden sample
- Yield reports
- Inspection reports
- Finished products
We need
Whatever you have.
- Validated design (or we validate it)
- Volumes and target cost
- Packaging and labels
- Certifications for your market
Quick answers
Why China?
The whole electronics supply chain is there. Fast and cost-effective.
Are the parts genuine?
Authorised sources only. Anything else is inspected first.
Is there a minimum order?
None from us. Factories set their own; we show prices per volume.
Tell us where your project is
Sketch, prototype or finished design. We'll tell you which steps it needs, and the cost.
More in Mechanical & Manufacturing
Mechanical & Manufacturing overviewRelated work
All work